Tuesday, June 26, 2007

Construction MF - Day 54-58

Kitchen plumbing is in. I had to rewire the air switch for the disposal (mix match of plug and hard wire). Installed the 2 front lights out front as well (again, had to create a custom fix to get the lights mounted on the existing boxes embedded in the brick). The beverage center is in (they were nice enough to scratch our new floor installing it). Leslie has unpacked the entire kitchen and organized everything. The oven and hood vent are currently being installed. Stainless back splash Thursday (we hope).

The oven is in! That thing frigin incredible. Leslie initiated the stove tonight... ahhhh, real food again.

con6-26-1.jpg con6-26-2.jpg con6-26-3.jpg con6-26-4.jpg con6-26-5.jpg con6-26-6.jpg con6-26-7.jpg