Wednesday, March 14, 2007

Construction Day 7

Framing for the doorways at the bottom of the stairs are done (headers in load bearing walls), the gazibo / wandering rose has been demolished, old dumpster removed and replaced with a smaller one, storage shed cleaned out , all of the lights / electrical have been roughed in and all of the plumbing roughed in - with the tub.

con71.jpg con72.jpg

No comments:

Post a Comment