Thursday, March 22, 2007

Construction Day 14

Ceilings got a second coat of paint, all the trim is in and some painted, bathroom is painted, bathroom has a floor lever compound on it for the slate floor (changed from the tile). White tile around the tub to the ceiling. The office back door was delivered (4 inches wider than the rough opening.. doh).

con141.jpg con142.jpg con143.jpg

No comments:

Post a Comment